Connect with us

News

Tinubu has redefined infrastructure delivery in FCT – Wike

Published

on

1786492834 FCT Minister Barr. Nyesom Wike 1024x682 1
FCT Minister Barr. Nyesom Wike 1024x682 1

The Minister of the Federal Capital Territory (FCT),  Nyesom Wike,  Wednesday said  the administration of President Bola Tinubu has fundamentally redefined infrastructure development  in the nation’s capital.

Wike made the remarks while addressing newsmen after he inspected some ongoing road projects designed to de-congest traffic and unlock development across the territory.

The minister inspected the ongoing construction of Arterial Road SI, from Ring Road II to Arterial Road S20 (Oladipo Diya Way) in Kaura District and Collector Road C2 in Life Camp to Arterial Road N5 (Obafemi Awolowo Way).

He also inspected the ongoing construction of Arterial Road N16 from Ring Road II to Ring Road III and the Jereton Mariere Street by the Apo Legislative Quarters in Gudu District, as well as the ongoing remodeling and renovation of the IBB Golf Course.

“We are happy because we can see that the administration of President Bola Tinubu has redefined infrastructure as far as the FCT is concerned,” Wike said.

Expressing satisfaction with the pace of work and quality of execution, the minister said the administration remained on track to deliver the projects ahead of the 2027 general elections.

He particularly expressed optimism that the Arterial Road N16 would be completed as scheduled, in spite of the complex terrain and heavy bridge construction on the road corridor.

He noted that in spite of the difficult geography, the firm guaranteed delivery by the first week of January

is an emerging journalism talent at NOP News Nigeria, bringing fresh energy and dedication to the media landscape. Inspired by global icons Christiane Amanpour and Richard Quest, she combines rigorous reporting with a commitment to journalistic excellence.

Trending