Connect with us

Society

NERC Approves N30bn To Meter Unmetered Band A, B Customers

Published

on

Untitled design 4 3

The Nigerian Electricity Regulatory Commission (NERC) has authorised N30bn for the third tranche of the Meter Acquisition Fund (MAF) to speed up the metering of unmetered Band A and Band B electrical energy clients throughout the nation.

The Commission disclosed this in Order No. NERC/2026/121 on the Operationalisation of Tranche C of the MAF, which took impact on November 2, 2026.

Under the association, the fund shall be distributed among the many 11 electrical energy Distribution Companies (DisCos) in proportion to their respective contributions to the fund.

NERC mentioned the funding can be used to meter all remaining unmetered Band A clients and speed up the metering of Band B clients, with equitable distribution throughout states throughout the respective DisCos’ franchise areas.

The Commission directed DisCos to conduct clear procurement processes involving eligible Local Meter Manufacturers and Assemblers (LMMAs) and Meter Asset Providers (MAPs) with verified meter inventory.

It added that most procurement costs had been prescribed based mostly on the median nationwide MAP on-line bid costs from the September 2026 bid cycle.

According to the order, funds to chose meter suppliers shall be made in two phases, with 70 per cent payable upon verified supply of meter inventory and the remaining 30 per cent after affirmation of full set up.

NERC confused that each one meters provided and put in below the MAF programme have to be supplied freed from cost to electrical energy shoppers.

It additionally directed that each meter should prominently show the identify of the related DisCo, the relevant MAF tranche and the inscription, “NOT FOR SALE”.

The Commission additional said that the place a DisCo initiates the relocation of an present buyer’s connection level for income safety functions, the price have to be borne by the DisCo.

It added that the order offers for sanctions the place a DisCo’s default impedes meter set up.

NERC mentioned the order establishes monitoring, reporting and analysis necessities for the Fund Manager, DisCos and taking part meter suppliers.

It additionally mandated that each one provide and set up contracts be filed with the Commission, whereas all meter installations below Tranche C have to be accomplished on or earlier than May 31, 2027.

The Commission urged all stakeholders to adjust to the order, saying the initiative would assist shut the nationwide metering hole, enhance income assurance, improve service supply and shield electrical energy shoppers.

I am a seasoned journalist known for my incisive reporting and unwavering commitment to journalistic integrity. As a key member of the nop.ng team, I specialize in delivering balanced coverage of socio political developments and cultural affairs throughout Nigeria. Driven by a passion for uncovering the truth regardless of the complexity of the issue I have established myself as a trusted voice in Nigeria’s dynamic media landscape, continually striving to empower my audience with clear, contextually rich news.

Trending